Lean & management
SMED
Single-Minute Exchange of Die — discipline of structured changeover, adapted for container glass as the Job Change Lifecycle and operationalised in the Job Change Tool.
How Lean Glass works with this
In an audit or engagement.
This term appears across our hot-end audits, forming audits and Job Change Tool work. If you would like to discuss how it shows up in your plant, book a call — every engagement begins with an operational diagnostic, not a sales pitch.
Related terms
Read next.
Job change lifecycle
The end-to-end discipline around a job change — planning (T-72h), pre-job SOP (T-24h), preheat (T-2h), execution, first ware, stabilisation and post-mortem (T+24h).
Job Change Tool
Lean Glass's purpose-built software combining SKU Library, Live Execution and KPI Tracking — the world's first systemised Job Change Tool for container glass.
30-minute call with a senior practitioner.
Bring a problem — leave with a direction.